![]() |
|||||||||||||
![]() |
|||||||||||||
![]() |
|||||||||||||
![]() |
|||||||||||||
![]() |
![]() |
![]() |
|||||||||||
![]() |
|||||||||||||
![]() |
|||||||||||||
![]() |
![]() |
|
| Ground Menu | The tour of the ground floor of the Test Center incorporates the following key system components:
1. 60-kW Microturbine Click on a desired link to access a tour that focuses on the target location. The tour of the control room becomes available while touring either the microturbine or the absorption chiller. |
NOTICE: The Honeywell Parallon microturbine shown in the ground floor menu of the tour has been replaced with a Capstone microturbine.
Back to top
CHPB Home Introduction How to Main Menu Ground Floor Roof Top